In continuation to the blog that i wrote on theory X and theory Y with respect to the employee-manager relationship there is one more example that came to my mind:
My second job was also with an architect who had done his masters from the United States of America and i joined him under the impression that i will get to learn something different from this man as he would have a different perspective to the whole designing idea which to a certain extent was true as i learned while working for him. His methodology of keeping a track of employee's work status and progress was also unique to me. There was a sheet we had to fill twice every day, once before lunch and once before closing for the day with the details of the work that we had done. My work however involved a lot of travelling to the construction sites and i would have to travel approximately 100 kms a day. This was a little difficult parameter to track as there were other variables that affected this like traffic, availability of transport, etc. He however would use the minimum time taken to travel to reach the destination and that too in his car and apply it on me. I tried to convince him but he wouldn't agree which made me lose interest in the job. Also since his wife too worked with him as she was an architect too, i would receive work load from her too giving almost the same deadlines and neither would give me a break if i failed to finish one's work because i was busy doing the other's work.
This i believe is an example of scenario 2 where the manager belongs to category X and employee belongs to category Y